Q1. How can virtual teams be improved?
(A) Use face to face communication when possible
(B) Don’t let team members disappear
(C) Keep everyone in the communication loop
(D) All of the above
Ans:- (D) All of the above
Q2. Conflict ___________ arises through management hierarchy organization structure or company philosophy.
(A) Goal oriented
(B) Administrative
(C) Interpersonal
(D) Intrapersonal
Ans:- (B) Administrative
Q3. For effective project teams, degree of mutual attraction that team member hold for each other and their task is called.
(A) Clear sense of mission
(B) Productive interdependency
(C) Cohesiveness
(D) Trust
Ans:- (C) Cohesiveness
Q4. Conflict resolutions include.
(A) Mediate, arbitrate, control, accept, eliminate
(B) Mediate, arbitrate, determinate, control, eliminate
(C) Mediate, determinate, reinforce, accept, eliminate
(D) Mediate, determinate, arbitrate, control, eliminate
Ans:- (A) Mediate, arbitrate, control, accept, eliminate
Q5. What are the scheduling and controlling techniques.
(A) Bar chart
(B) Network techniques ( PERT/CPM)
(C) Line of balance (LOB)
(D) All of above
Ans:- (D) All of above
Q6. Pickup the incorrect statement from the following:
(A) An activity of a project is denoted by an arrow on the network
(B) The tail of the arrow indicate the start of the activity
(C) The head of the arrow indicates the end of the activity
(D) The arrow are drawn to scale from left to right
Ans:-
Q7. Critical path is Is
(A) Is always longest
(B) Is always shortest
(C) May be longest
(D) May be shortest.
Ans:- (A) Is always longest
Q8. Which of the statement is true?
(A) PERT and CPM are both considered as deterministic approach
(B) PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach .
(C) PERT is considered as a deterministic approach and CPM is a probabilistic techniques
(D) PERT and CPM are both probabilistic techniques
Ans:- (B) PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach .
Q9. In a CPM/PERT network a dummy activity is necessary when
(A) Two activities have same starting node
(B) Two activities have same ending node
(C) Are found in both AOA and AON network
(D) When two activities share the same starting and ending node
Ans:- For Answer Click Here
Q10. The Gant chart is used to:
(A) Track the cost of the activities
(B) Control cost of all the activities
(C) Provide a schedule of the activities
(D) Provide a schedule and track costs of activities
Ans:- (C) Provide a schedule of the activities